Skip to main content

FRACTURE CRITICAL: County looks to begin another repair project

November 19, 2012

COLUMBIA CITY — Every two years, Whitley County bridges are inspected to ensure the existing structures are safe for use.

Currently, the county is working to hand over the plans for a bridge repair project located at CR 600 N. west of 450 E.

“It’s the only one that we have left on the list that’s fracture-critical,” said Whitley County Engineer Brandon Forrester.

According to Forrester, the bridge is 23 and a half feet in length and width and nearly 40 years old.

Forrester said most bridges are supported by a main beam ­— if that beam were to fail, the whole bridge could crumble.

According to Forrester, workers attempted to fix the bridge in the past by building a wall to protect the bottom of the embankment. But ice and water caused the wall to crack and fail — creating the need for this year’s repair project.

The cost for the project will be known when plans are finalized.

He said work will begin on the bridge when the current repair project on CR 700 E. is completed — within the next two months.

For a more in depth look at this story, see the Nov. 19 issue of The Post and Mail. Don’t have a subscription? Call (260) 244-5153 or subscribe to our e-edition. For breaking news, sports updates and additional coverage, bookmark the homepage and find us on facebook.

SOUTH WHITLEY — Whitko’s boys and girls soccer teams picked up Three Rivers Conference wins...
SYRACUSE — Coaches say Saturday high school volleyball tournaments can be beneficial to those who...
LIGONIER — Columbia City’s boys and girls cross country teams yet again took on some of the top...

 

Premium Drupal Themes by Adaptivethemes